Loading...

We found 43,451 Results
Click & drag to scroll 
  • Pecém I Thermo Plant

    1/16/19
    Brazilian power holding company EDP Energias do Brasil holds a full share (100%) of the Pecém I thermo plant project. The project was previously owned by Eneva, ex MPX, and EDP in a 50/50 split, before Eneva sold its interest to EDP....

  • Monthly power fees: Argentina

    1/16/19
    File containing power prices per month in Argentina. The time series runs from January 2011 to December 2018. Prices are expressed in the local currency (Argentine peso) and include the following tariffs: - Wholesale clients:...

  • Ituango hydro

    1/16/19
    The Ituango hydro project calls for the construction and operation of a hydroelectric power plant on the Cauca river. The mega project requires a dam that will create a 2.7Bm3 water reservoir. Transmission infrastructure includes a...

  • Punta Cherrepe wind farm

    1/16/19
    The project calls for the construction of a wind farm in the districts of Pueblo Nuevo, Guadalupe and Lagunas located, Chepén, Pacasmayo and Chiclayo provinces, La Libertad and Lambayeque districts, Peru. It is expected to install...

  • Domeyko solar park

    1/16/19
    The project calls for the construction and operation of a photovoltaic plant, spread over 81ha, that will inject the produced power into Chile's central SIC power grid. Construction will demand a maximum of 120 workers while...