Loading...

We found 50,162 Results
Click & drag to scroll 
  • El Mataco wind farm

    9/17/18
    The project is born from the Tornquist area's energetic need. In addition, the park will generate more than 200 jobs in the construction phase. Then, in the stages of lower intensity, it is expected to employ 40-50 permanent...

  • San Jorge wind farm

    9/17/18
    The San Jorge wind farm will have 24 wind turbines. In addition, the park will generate more than 200 jobs in the construction phase. Then, in the stages of lower intensity, it is expected to employ 40-50 permanent employees during...

  • Brief: Argentine ported numbers hit 6.6mn

    9/14/18
    Mobile numbers ported in Argentina hit 6.64mn at the end of July, up 26% from a year before, telecom regulator Enacom reported. The number portability regulation was introduced in the country in 2012. According to Enacom, 73.4% of...

  • Ancasti

    9/14/18
    The Pampean pegmatite province in northwest Argentina hosts numerous lithium bearing pegmatite deposits with added potential of tantalum, rare earth elements, beryllium and tin. The geology is similar to Western Australian pegmatite....